Malham YHA – External Refurbishment

September 28th, 2011 | Posted in Blog, Portfolio | No Comments
Tags: , , , , , ,

McGrath Associates have successfully managed the external refurbishment of Malham YHA.  The project was delivered under budget and on time with the hostel remaining open throughout the works.

Wastwater YHA Year 2 Works

September 21st, 2011 | Posted in Blog, Portfolio | No Comments
Tags: , , , , , , , ,

As reported in a previous post, McGrath Associates were again appointed to survey, specify and manage this year’s refurbishment works at Wastwater YHA.  The works were complete during the winter shutdown with full co-operation of the hostel manager.  The works were completed on time and well within budget by competitively tendering the works.

McGrath Associates successfully resolve issues at Idwal Cottage YHA

September 20th, 2011 | Posted in Portfolio | No Comments
Tags: , , , , , , ,

McGrath Associates were instructed to draft a feasibility report on the existing condition and future repair liability of Idwal Cottage roof.   The roof suffered numerous problems with water ingress resulting in the closure of parts of the hostel, which hindered the successful running of the hostel and also incurred lost revenue.   On inspection the standard of the workmanship to the main roof was very poor and the quality of the new slates used was questionable.  Our long term recommendation is for the roof be re-covered in whole providing a water tight solution for the foreseeable future.  In the short term essential repairs were undertaken to along with internal decoration to the damaged rooms.

idwal-cottage

During the instruction we also had to liaise with the clients ecologists as bats had previously been reported around the building.   During the inspection we managed a roofing contractor to undertake essential short term repairs and provide bat access to the roof void under the supervision of the ecologist.   The report was well received and we are awaiting further instruction for the client with respect to implementation of the the long term solution.

idwal-cottage-2

McGrath Associates manage improvement of facilities at Pen Y Pass & Bryn Gwynant YHA

September 20th, 2011 | Posted in Portfolio | No Comments
Tags: , , , , , , , , , ,

McGrath Associates were commissioned as Building Surveyors for the refurbishment of the shower and WC facilities at Pen Y Pass and Bryn Gwynant Youth Hostels. The works included complete strip out of the facilities followed by installation of new standard specification wet rooms, WC’s, WHB, new flooring and redecoration.  The works were initially instructed separately but as the hostels are within close proximity McGrath Associates combined the projects into a single project, saving time and money for the client.

The project had to be managed carefully as the client had guest bookings to honour during the project. The welfare facilities had to be functional during the weekends when guests were in the hostel. The project was successfully completed on programme, within budget and with no disruption to the business. Both the management and guests have commented on the high standard of fit out.

McGrath Associates manage Gas & Water Main Replacement – Edale YHA

September 10th, 2011 | Posted in Blog, Portfolio | No Comments

McGrath Associates were instructed by the YHA to Project Manage the installation of a new gas and water main  at Edale Youth Hostel in the beautiful Peak District.

edale-1

The route of the existing water main was across adjoining agricultural land and followed a complicated route through surrounding woodland.  Agreement had to be made with the adjoining land owner and Local Water Authority prior to works commencing.   The new gas main was also laid at the same time and detailed programmes were drafted to keep disruption to a minimum.  The project was completed to programme with no disruption to either the hostel or adjoining owner.

edale-31